APS Group · Dubai, UAE

Protecting People.
Preserving Places.

APS Group assesses risk and delivers specialist systems that strengthen buildings, critical infrastructure and the people who depend on them.

Blast mitigationSpray-applied polymer reinforcement
WaterproofingSeamless spray and cold-applied membranes
Anti-drone protectionPassive stand-off netting architecture

01 —

Blast Resistant Solution

A lightweight barrier against blast effects.

A fast-curing, spray-applied polymer membrane that helps absorb impact energy, contain fragmentation and reduce structural damage in new or existing buildings.

The system retrofits existing rooms and structures with limited disruption to occupied and operational sites. Once fully cured it is non-toxic and adds sound-reduction benefits.

Request a quotation ↗
APS Group specialist spray-applying a protective polymer membrane

Application sequence

Protection, built layer by layer.

  1. 01PrepareThe substrate is inspected, cleaned, repaired and primed for full adhesion.
  2. 02SprayThe two-component polymer is applied in controlled passes to build the specified thickness.
  3. 03Cure & verifyRapid curing is followed by visual, adhesion and thickness quality checks.
6–8 mmTypical coating thickness*
Few daysSpray application
10+ yearsWarranty available*
RetrofitNo heavy reconstruction
Water & abrasionResistant finish
CostEffective reinforcement

Why this solution

  • Retrofit, not rebuildReinforces existing rooms and structures without heavy safe-room construction.
  • Fast to deployRapid curing helps limit disruption to occupied and operational sites.
  • SeamlessSpray-applied without joints or overlaps.
  • Additional benefitsNon-toxic once cured, with supplementary sound reduction.

Designed for

  • PeopleBedrooms, protected rooms and safe areas.
  • Public infrastructureHotels, schools, hospitals and essential buildings.
  • HospitalityResorts and guest environments requiring discreet reinforcement.
  • Critical assetsData centres, refineries and government infrastructure.

*Final thickness, weight and warranty depend on the selected system, substrate, testing requirements and project scope.

APS Group specialists spray-applying a seamless waterproof membrane on a roof in Dubai

02 —

Waterproofing Solutions

One objective. Two application strategies.

APS Group selects the application method around surface area, access, geometry and return-to-service requirements, creating a fully bonded, seamless barrier without weak joints or overlaps.

Request a site assessment ↗

Application to protection

A seamless barrier that turns rain away.

  1. 01PrepareThe surface and every junction are cleaned, repaired and prepared for full adhesion.
  2. 02ApplyThe selected membrane is installed continuously to the project-specific build-up and thickness.
  3. 03ProtectOnce cured, the fully bonded membrane leaves no seams or overlaps for rainwater to track through.

01 · Large surfaces

Spray-applied membrane

For speed, uniform thickness and uninterrupted coverage.

  • Roofs, podium decks and exposed structures
  • Rapid coverage across large or complex areas
  • Options for UV, traffic, impact and chemicals
  • Application to the required thickness

02 · Small and detailed surfaces

Cold-applied membrane

For precise work around details, difficult access and local repairs.

  • Terraces, balconies, wet areas and junctions
  • Applied by roller, brush, rake or trowel
  • No heating or specialist spray equipment required
  • Fully bonded, seamless and crack-bridging
≈30 min*Rapid waterproofing properties
100% solidsVOC-free · zero solvents
SeamlessFully bonded barrier
01Complex geometryContinuous coverage across corners, penetrations and irregular surfaces.
02Built for exposureSystems selected for abrasion, impact, chemicals, UV and traffic.
03Controlled installationPreparation and application matched to real site conditions.
04Project-specific build-upFinal system defined around access, surface, use and return-to-service needs.

*Actual curing time and performance depend on the selected system, substrate preparation and site conditions.

03 —

Anti-Drone Net System

Passive protection architecture.

A modular system of coated netting, composite support poles and an anchoring system designed to reduce the effects of attacks by weaponised drones and loitering munitions on protected assets.

Stand-off protection is one of the key strategies to force a munition to detonate away from its intended target. The system is scalable, retrofittable and repairable, adapting to different infrastructure layouts and threat levels.

Discuss your protection requirements ↗
Field test of a net-based stand-off protection system
Modular net structure over a protected building
Strategic buildings
Illustration of a net system over an oil and gas storage tank
Oil & gas assets · illustration
Transformers & substationsMunitions depotsOil & gas refineriesBorder securityStrategic buildingsMilitary applications

Modular · Scalable · Retrofittable · Repairable. Each project is engineered to site layout and threat assessment; scope and performance are confirmed at proposal stage.

04 —

Our Markets

Protection across the places people rely on.

From occupied buildings to high-consequence industrial sites, APS Group adapts the protection strategy to the asset, its users and its operational priorities.

Residential towers in Dubai at sunset
01

Residential

Private homes, residential towers, protected rooms and community assets.

School students approaching a campus in Dubai
02

Education

Schools, campuses and facilities supporting daily learning.

Hospital and landscaped grounds in the UAE
03

Healthcare

Hospitals, clinics and essential healthcare environments.

Luxury resort on Palm Jumeirah in Dubai
04

Hospitality

Hotels, resorts and guest environments requiring discreet protection.

Large data centre and cooling infrastructure
05

Data Centres

High-value digital infrastructure requiring continuous protection.

Oil refinery and storage tanks
06

Oil & Gas

Refineries, processing plants and assets exposed to demanding conditions.

Strategic government aviation facility
07

Government

Public buildings and strategic government infrastructure.

Airport terminal
08

Secure Facilities

Airports, controlled logistics hubs and other security-sensitive environments.

05 —

Selected References

Proven across demanding environments.

Representative projects delivered with our technology partner, across landmark developments, essential infrastructure and high-security environments.

Blast mitigation test structure

Blast mitigation references

Protection where consequences are high.

  • UAE
    Ammunition storage roomsPolymer reinforcement to help protect surrounding facilities from shockwaves, fragmentation and debris.
  • Somalia
    Military baseReinforcement for critical infrastructure exposed to blast shockwaves and shrapnel.
  • Jordan
    Five-star hotel suitesVIP room protection to improve resistance to fragmentation and shrapnel.
Terrace in heavy rain with Dubai's skyline in the background

Waterproofing references

Seamless protection at scale.

  • 9,000 m² · UAE
    Marsa Al ArabSpray-applied continuous membrane across a major podium deck.
  • 40,000 m² · UAE
    Jebel Ali Treatment PlantProtective lining for primary sedimentation tanks in a demanding operational environment.
  • 6,800 m² · UAE
    Emirates Airlines Ramool WarehouseCold-applied waterproofing for a metal roof and its detailed junctions.

References relate to projects delivered by our technology partner with the systems presented here. Some projects are confidential.

06 —

Our Process

A clear route from risk to protection.

One accountable sequence, from the first site review to the final quality handover.

01Understand

Site assessment

Infrastructure, surface, exposure, access and project constraints.

02Define

Action plan & quotation

Technical approach, system build-up, scope and commercial proposal.

03Deliver

Specialist installation

Surface preparation and application by trained specialists.

04Confirm

Quality handover

Final checks, practical guidance and post-project support.

Dubai skyline with the Burj Khalifa

07 —

Technology & Quality

Local application. International technologies.

APS Group combines local project delivery with a Dubai-based technology partner developing specialist polyurea, polyurethane and polyaspartic systems since 2003.

01Specialist formulationsSystems developed for buildings, infrastructure and industrial assets.
02Application expertiseTechnical support for system selection, equipment and installation.
03Recognised standardsQuality, environmental, health and safety management credentials.

Partner milestones

  • 2004Dedicated manufacturing facility commissioned
  • 2008Exclusive Graco HPCI distributor in the Middle East
  • 2019Expanded operations and manufacturing internationally

Certifications

ISO 9001:2015Quality management
ISO 14001:2015Environmental management
ISO 45001:2018Occupational health & safety
WRAS ApprovedDrinking-water applications

Industry recognition

  • PDA Europe member
  • Coatings & Waterproofing Supplier of the Year 2023
  • Graco HPCI spray equipment distributor

Certifications, approvals and industry recognition relate to the technology partner and selected systems.

08 —

Discuss a Project

Start with the asset. We'll define the protection.

Send us the project location, the risk or problem to address, approximate area and current stage. We'll recommend the right next step.

Tell us about your project.